Archives

The Day of energy!

Group of companies “Pride” congratulates power engineering specialists on their professional holiday – the Day of energy!

Video of the completed site “Assembly of service building of machine engineering plant UralSpecTrans”

In 2016 Group of companies PRIDE has completed the assembly of steel strucutres for service building of machine engineering plant UralSpecTrans.

Look the video of the completed site!

Group of companies PRIDE performs “turn key” construction of buildings of high complexity!
✔ Industrial buildings and premises
✔ Industrial facilities and equipment
✔ Warehousing and logistics centers
✔ Athletic facilities
✔ Shopping and entertainment and business complexes
✔ Agricultural industry
✔ Fabrication and assembly of technological equipment at industrial plants.

Assembly of machinery at the “URALS FOIL”

As part of the modernization program of JSC “Urals foil”, which is part of the OK “Rusal”, the group of companies “Pride” carries out the installation of aluminum annealing furnace (75 tons) of the company SECO / Warwick. “Urals foil” is one of the fastest growing companies of foil industry in Russia. Production capacity is 16 500 tons of aluminum. The company is located in Mihaylovsk, Sverdlovsk region.
Installation of equipment is one of the activities of the group of companies “Pride.” Availability of qualified personnel enables to do the installation of special technological equipment with high quality and in time.

Assembly of framework at gas cleaning unit for the RUSAL – global aluminium producer

Group of companies PRIDE is carrying out assembly works at the sites of the biggest aluminium giant RUSAL. RUSAL operates in 19 countries on 5 continents. Сurrently, PRIDE has been doing an assembly of framework of a gas cleaning unit at the site of the SUAL-Kremniy Ural Llc. (Urals Silicon) located ar Kamensk-Uralsky. What kind of other works PRIDE performs for RUSAL corparation read in next posts.

Installation of 2nd roll of reservoir of drinking water for the RVS-2000 for the Poultry farm “Sverdlovskaya”

At the site Poultry farm “Sverdlovsk” the second reservoir of drinking water RVS-2000 is installed. Installation is carried out in several stages. Tanks with a diameter of 12 m are completely welded at the factory and are rolled. The roll is delivered to the site and is installed in the design position. Before unfolding the roll bonded loop of the rope, the end of which is fixed on the tractor or winch. Rods, that fastens a roll, are cut by the oxygen and loosening the loop of the rope allows the roll to unfold. After forming the end part of the walls, field that joints walls is welded . In the photo – the stage of unfolding the walls.

Tank RVS-2000 for puoltry farm “Sverdlovskaya”

Group of companies PRIDE has signed the contract for fabrication and assembly of tanks for drinking water of type RVS-2000 for puoltry farm “Sverdlovskaya”. It should be reminded that apart from quickly erectable structures PRIDE fabricates and assemble technological equipment like tanks, chimneys. ducts, and other non-standard equipment.