Power station “Reftinskaya GRES” PJSC «Enel Russia»

Sverdlovsk region, Russia
- The works of changing fabric filters, induced-fraught fans and air-heaters of the 4th and 7th power-generating units of 300MW and 500MW correspondingly; - Аssembly of coolers of a compressor plant and the system of instrumentation air within the project of reconstruction of the ash-and-slad removal system and other works of assembling of metal structures at the station.
2014-2016 year